SB 1208: Modifies provisions related to net metering

In committee Official data

  1. Introduced
  2. In committee
  3. Passed one chamber
  4. Passed both chambers
  5. Enacted

Last official action: ·Record last updated:

Plain-language summary

SB 1208 is a bill introduced in the Missouri Senate on December 1, 2025. According to its official title, it concerns: Modifies provisions related to net metering. Primary sponsor: Kurtis Gregory (Republican). Most recent recorded action (March 10, 2026): Hearing Conducted S Commerce, Consumer Protection, Energy & the Environment Committee.

Generated automatically from the official title, sponsor list, and status record only. It does not characterize the bill’s purpose or effects. How summaries are written

Official summary

Abstract published by the legislature (via Open States). Text as published by the legislature; reproduced verbatim.

SB 1208 - Under the act, a retail electric supplier shall offer net metering, as defined in the act, to customer-generators pursuant to a Public Service Commission approved tariff of an electrical corporation or contract approved by the governing body of other retail electric supplies under certain options described in the act. A customer-generator's facility shall be equipped with certain equipment including, but not limited to, necessary electric distribution system upgrades. If the electricity generated by the customer-generator exceeds the electricity supplied by the supplier during a billing cycle, the customer-generator shall demand charges for the billing cycle. Each qualified electric energy generation unit used by a customer-generator shall be installed, maintained, and repaired in accordance with all applicable industry standards described in current law. All qualified electric energy generation units utilizing battery backup shall be installed to operate completely isolated from the retail electric supplier's system including all neutral connections and grounding points during times of back up operation. Unless allowed under the provisions of the act, no retail electric supplier shall impose any fee or other requirement as described in current law, except that a retail electric supplier may require that a customer-generator's system contain adequate surge protection, or other accessible device that would allow emergency response personnel to disconnect from the electric distribution system. Applications by a customer-generator for interconnection of a qualified electric energy generation shall be accompanied by a plan for the customer-generator's electrical generating system and reviewed by a retail electric supplier, unless mutually agreed to. Prior to the interconnection of the qualified electric energy generation to the retail electric supplier's system, the customer-generator will furnish a retail electric supplier a certification from a professional electrician or an engineer deemed qualified by the retail electric supplier. If the professional electrician or engineer is not licensed, the retail electric supplier may require a bond or other form of financial security to ensure the safe installation and operation of the qualified electric energy generation unit. The estimated generating capacity of all net metering systems shall count for purposes of compliance with any applicable federal law. Any non-retail electric supplier who sells a qualified electric energy generation unit or who provides a net metering service to a customer-generator under the act shall be subject to certain requirements described in the act. Provisions of the act shall be enforced by the Attorney General under the Missouri Merchandising Practices Act as described in the act. The act is identical SB 467 (2025), SB 855 (2024), HB 1705 (2024), HB 1854 (2024), substantially similar to HB 370 (2025), HB 940 (2025), and similar to SB 642 (2023), HB 709 (2023) and HB 991 (2023). JULIA SHEVELEVA

Sponsors

Sponsors by party (alphabetical): Republican 1

NameRolePartyChamberDistrict
Kurtis GregoryPrimary sponsorRepublicanSenate21

“Support” is shown only as formal sponsorship recorded by the legislature. Roll-call votes are available on the official bill page.

Recent official actions

  1. Hearing Conducted S Commerce, Consumer Protection, Energy & the Environment Committee
  2. Second Read and Referred S Commerce, Consumer Protection, Energy & the Environment Committee
  3. S First Read
  4. Prefiled