Indiana · 2025 Regular Session · Bill

HB 1007: Energy generation resources.

Enacted Official data

  1. Introduced
  2. In committee
  3. Passed one chamber
  4. Passed both chambers
  5. Enacted

Last official action: ·Record last updated:

Plain-language summary

HB 1007 is a bill introduced in the Indiana House on January 13, 2025. According to its official title, it concerns: Energy generation resources. Primary sponsor: Eric Koch (Republican), Ed Soliday (Republican). It lists 39 additional sponsors. Most recent recorded action (May 6, 2025): Public Law 217.

Generated automatically from the official title, sponsor list, and status record only. It does not characterize the bill’s purpose or effects. How summaries are written

Official summary

Abstract published by the legislature (via Open States). Text as published by the legislature; reproduced verbatim.

Provides a credit against state tax liability for expenses incurred in the manufacture of a small modular nuclear reactor (SMR) in Indiana. Establishes procedures under which certain energy utilities may request approval for one or more of the following from the Indiana utility regulatory commission (IURC): (1) An expedited generation resource plan (EGR plan) to meet customer load growth that exceeds a specified threshold. (2) A generation resource submittal for the acquisition of a specific generation resource in accordance with an approved EGR plan. (3) A project to serve one or more large load customers. Sets forth: (1) the requirements for approval of each of these types of requests; (2) standards for financial assurances by large load customers; and (3) cost recovery mechanisms for certain acquisition costs or project costs incurred by energy utilities. Amends the statute concerning public utilities' annual electric resource planning reports to the IURC to provide that for an annual report submitted after December 31, 2025, a public utility must include information as to the amount of generating resource capacity or energy that the public utility plans to retire or refuel with respect to any electric generation resource of at least 125 megawatts. Provides that for any planned retirement or refueling, the public utility must include, along with other specified information, information as to the public utility's plans with respect to the following: (1) For a retirement, the amount of replacement capacity identified to provide approximately the same accredited capacity within the appropriate regional transmission organization (RTO) as the capacity of the facility to be retired. (2) For a refueling, the extent to which the refueling will maintain or increase the current generating resource accredited capacity or energy that the electric generating facility provides, so as to provide approximately the same accredited capacity within the appropriate RTO. Requires IURC staff to prepare a staff report for each public utility report that includes a planned electric generation resource retirement. Provides that if, after reviewing a public utility's report and any related staff report, the IURC is not satisfied that the public utility can satisfy both its planning reserve margin requirement and the statute's prescribed reliability adequacy metrics, the IURC shall conduct an investigation into the reasons for the public utility's inability to meet these requirements. Provides that if the public utility's report indicates that the public utility plans to retire an electric generating facility within one year of the date of the report, the IURC must conduct such an investigation. Provides that: (1) a public utility may request, not earlier than three years before the planned retirement date of an electric generation facility, that the IURC conduct an investigation into the planned retirement; and (2) if the IURC conducts an investigation at the request of the public utility within that three year period, the IURC may not conduct a subsequent investigation that would otherwise be required under the bill's provisions unless the IURC is not satisfied that the public utility can satisfy both its planning reserve margin requirement and the statutory reliability adequacy metrics as of the time the investigation would otherwise be required. Provides that if a CPCN is granted by the IURC for a facility intended to repower or replace a generation unit that is planned for retirement, and the CPCN includes findings that the project will result in at least equivalent accredited capacity and will provide economic benefit to ratepayers as compared to the continued operation of the generating unit to be retired, the CPCN constitutes approval by the IURC for purposes of an investigation that would otherwise be required. Provides that if, after an investigation, the IURC determines that the capacity resources available to the public utility will not be adequate to allow the public utility to satisfy both its planning reserve margin requirements and the statute's prescribed reliability adequacy metrics, the IURC shall issue an order: (1) directing the public utility to acquire or construct; or (2) prohibiting the retirement or refueling of; such capacity resources that are reasonable and necessary to enable the public utility to meet these requirements. Provides that if the IURC does not issue an order in an investigation within 120 days after the initiation of the investigation, the public utility is considered to be able to satisfy both its planning reserve margin requirement and the statutory reliability adequacy metrics with respect to the retirement of the facility under investigation. Provides that if the IURC issues an order to prohibit the retirement or refueling of an electric generation resource, the IURC shall create a sub-docket to authorize the public utility to recover in rates the costs of the continued operation of the electric generation resource proposed to be retired or refueled, subject to a finding by the IURC that the continued costs of operation are just and reasonable. Makes a technical change to another Indiana Code section to recognize the redesignation of subsections within the section containing these provisions.

Sponsors

Sponsors by party (alphabetical): Democratic 1 · Republican 40

NameRolePartyChamberDistrict
Eric KochPrimary sponsorRepublicanSenate44
Ed SolidayPrimary sponsorRepublicanHouse4
David AbbottCo-sponsorRepublicanHouse18
Mike AylesworthCo-sponsorRepublicanHouse11
Beau BairdCo-sponsorRepublicanHouse44
Steve BartelsCo-sponsorRepublicanHouse74
Bruce BordersCo-sponsorRepublicanHouse45
Martin CarbaughCo-sponsorRepublicanHouse81
Matt CommonsCo-sponsorRepublicanHouse13
Kendell CulpCo-sponsorRepublicanHouse16
Dale DeVonCo-sponsorRepublicanHouse5
Craig HaggardCo-sponsorRepublicanHouse57
Dave HallCo-sponsorRepublicanHouse62
Bob HeatonCo-sponsorRepublicanHouse46
Dave HeineCo-sponsorRepublicanHouse85
Chris JeterCo-sponsorRepublicanHouse88
Jack JordanCo-sponsorRepublicanHouse17
Chris JudyCo-sponsorRepublicanHouse83
Mike KarickhoffCo-sponsorRepublicanHouse30
Ryan LauerCo-sponsorRepublicanHouse59
Matt LehmanCo-sponsorRepublicanHouse79
Danny LopezCo-sponsorRepublicanHouse39
Jim LucasCo-sponsorRepublicanHouse69
Chris MayCo-sponsorRepublicanHouse65
Wendy McNamaraCo-sponsorRepublicanHouse76
Doug MillerCo-sponsorRepublicanHouse48
David NiezgodskiCo-sponsorDemocraticSenate10
Julie OlthoffCo-sponsorRepublicanHouse19
J.D. PrescottCo-sponsorRepublicanHouse33
Jim PresselCo-sponsorRepublicanHouse20
Linda RogersCo-sponsorRepublicanSenate11
Daryl SchmittCo-sponsorRepublicanSenate48
Alaina ShonkwilerCo-sponsorRepublicanHouse29
Ben SmaltzCo-sponsorRepublicanHouse52
Hunter SmithCo-sponsorRepublicanHouse24
Craig SnowCo-sponsorRepublicanHouse22
Greg SteuerwaldCo-sponsorRepublicanHouse40
Jake TeshkaCo-sponsorRepublicanHouse7
Jeff ThompsonCo-sponsorRepublicanHouse28
Tim WescoCo-sponsorRepublicanHouse21
Alex ZimmermanCo-sponsorRepublicanHouse67

“Support” is shown only as formal sponsorship recorded by the legislature. Roll-call votes are available on the official bill page.

Recent official actions

  1. Public Law 217
  2. Signed by the Governor
  3. Signed by the President of the Senate
  4. Signed by the President Pro Tempore
  5. Signed by the Speaker
  6. House concurred with Senate amendments; Roll Call 512: yeas 63, nays 23
  7. Motion to concur filed
  8. Returned to the House with amendments
  9. Third reading: passed; Roll Call 423: yeas 36, nays 13
  10. Senator Schmitt added as cosponsor
  11. Senator Niezgodski added as cosponsor
  12. Amendment #5 (Yoder) failed; Roll Call 373: yeas 11, nays 35

Showing 12 most recent of 35 actions. Full history

Sources

  1. Open States / Plural (data from the official legislature website)
  2. Official legislature source